Case Studies
Outstanding projects highlighting services design and operation
Adapting to university life: UCL’s Student Centre emerges from lockdown
The new Student Centre at University College London has reopened after lockdown, and its flexible design means numbers can increase as social distancing guidelines change.…
Healthy and smart: Edge’s plans for a London Bridge office tower
Smart-office pioneer Edge is coming to London and aiming for the highest ratings possible for Breeam and Well certification. Andy Pearson speaks to Atelier Ten’s…
A marvel of science: Institute of Physics headquarters
The Institute of Physics’ innovative use of ground source heat pumps helped it secure the Commercial/Industrial Project of the Year accolade at the CIBSE Building…
Rapid response: delivering a 4,000-bed NHS Nightingale Hospital in nine days
When ExCeL was chosen as the site for an NHS Nightingale Hospital, the project team had nine days to build a 4,000-bed critical care facility…
How ExCel’s services were adapted for NHS Nightingale
BDP publishes instruction manual showing how other large buildings could be converted into field hospitals
CIBSE’s Retrofit Project of the Year – UCL, 22 Gordon Street
The CIBSE award-winning retrofit of 22 Gordon Street has saved University College London £110,000 in annual bills. Andy Pearson looks at how BuroHappold Engineering used…